(click for larger image)


(click for larger image)

WHAT'S NEW

Prior to product production, UBS identifies the specific engineering requirements for each project location. Next, our design team along with our engineers follow through and create the superstructure. Each housing system is designed distinctively enabling ease of assembly. (A minimum of 2 people without the use of heavy equipment) Our housing systems can be expressly engineered to endure 160 mph (256 kph) winds speeds as well as a magnitude of 8 on the Richter Scale.

 

© 2006 Universal Building Solutions | All Rights Reserved